There are 5 work packages (WPs) in the project:
WP1: Offshore wind conditions in China
WP2: Aerodynamic rotor design
WP3: Structural optimization of wind turbine blades
WP4: Control of wind turbines under offshore wind conditions in China
WP5: Wind tunnel verification